pet incinerator
The incinerator plant shall incorporate a control panel for its operation. On the control panel we shall have a visual display of the chamber temperatures. This visual display must control…
The incinerator plant shall incorporate a control panel for its operation. On the control panel we shall have a visual display of the chamber temperatures. This visual display must control…
Petrol: diesel Consumption: 8-10liter/hour Capacity: to cremate (carrion and spoils) 350-400kg/hour Temperature: 900-1350?C Operation temperature: -30~40?C Incinerator weight: 1800-2000 kg Volume: 0.70-0.80m/cube Exterior…
* Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve. * A secondary…
* medical incinerators, The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminium and insulates bricks in order to assure a minimum…
1. Capacity of destruction in weight: 60 Kg/h. 2. It should be able to operate not less than 10 hours/day 3. This incinerator must be able to destruct all combustible…
INCINERATEUR DE DECHETS HOSPITALIER hospital incinerator design SPECIFICATIONS TECHNIQUES. Capacité destructive de 55 Kg/h jour de déchets hospitaliers avec un p?.c. i jusqu’à 3.200 Kcal/Kg 1)Type de déchet hospitalier 2)Pouvoir…
Our normal activities generates 2-5 tons of assorted waste materials per day which range from condemned carcasses, and medical incinerator primary combustion price other wastes all which need to be…
Capacity Not less than 500Kg/hr. Operation 24hr-7days/week continuous operation. Combustion chamber 2 combustion chamber. Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be…
1 Basic Plant Design An approved plant must have four distinct sections that demonstrate three principles of Turbulence, Residence Time and Temperature are inbuilt in the plant design .The regulated…
the following containerized incinerators. (Kitchen and accommodation and grey water and black water plant removing waste) we need incinerator is each function separate are all in one incinerator we need…