hospital incinerator
Supply, installation and testing of medical waste incinerator with a capacity of 75 kg / hr gas (LPG) complete with all accessories and consequently with the chimney in accordance with…
Supply, installation and testing of medical waste incinerator with a capacity of 75 kg / hr gas (LPG) complete with all accessories and consequently with the chimney in accordance with…
Large incinerators - INDUSTRIAL INCINERATORS - specs below. 2.) Size requirement for the incinerators is 750 -- 850 kg capacity 3.) The bum rate should be 80 LL 100 kg/…
Waste calorific value : 4000KCAL/KG Moisture Content : 10-25% Nominal Capacity : 50Kg/Hour batch load Secondary Chamber : 2 Seconds @ 850degrees C The primary combustion chamber must ensure minimum…
Primary chamber – Consists of a monolithic high grade refractory concrete with high grade insulation backing, . Utilising a refractory hearth or equivalent for continuous ash removal. Secondary Chamber –…
CONTAINERIZED INCINERATOR FOR INCINERATING HAZARDOUS AND NON HAZARDOUS WASTES (BOTH DOMESTIC AND INDUSTRIAL) AT A MINIMUM RATE OF 300KG/HR WITH THE FOLLOWING SPECIFICATIONS: Ø PRIMARY CHAMBER VOLUME 7.2M³ Ø BURNING…
the incinerator can be used to dispose Medical waste IV, used needles, used syringes, scalpels, used dressing material ,personal protective equipments like gown, gloves etc. amputated body parts, excreta from…
1 Incinerator 30 =KG burn/h and it must have a Scrubber. 2 Incinerator must have Electrical Plastic Shredder for cutting of glass bottle,surange of Medicine. 3 Incinerator must have Electrical…
Hospital Waste Management as well as Competitive prices as Pakistan is a competitive market. We have a complete setup with Office, Customer Relations, Import / Export, Biomedical Department, Application Support…
Incinerator for hospital waste management with the following features: • In high temperatures (pyrolytic incinerator two chambers with temperatures ranging from 950 º C to 1320 º C; • Ability…
INCINERATOR, DIESEL DRIVEN waste type : HEALTH CARE WASTE Waste calorific value : 4000KCAL/KG Moisture Content : 10-25% Nominal Capacity : 50Kg/Hour batch load Secondary Chamber : 2 Seconds @…