Industrial Type Wastage Incinerator Industrial Type Incinerator General Specification i.System Capacity: 100KG/h

Industrial Type Wastage Incinerator Industrial Type Incinerator General Specification i.System Capacity: 100KG/h ii.Type of Waste: Municipal Waste (Paper, Plastic, Wood etc.) iii.Waste Feeding: Manual iv.Fuel: Natural Gas v.Incinerator Type: Double Chamber vi.Expernal Cladding: MS Sheet of suitable Gauge, Painted with corrosion resistant paint vii.Flue Gas Emission Discharged to the Atmosphere should meet Pakistan National Environment Quality Standards (NEQS) viii.User Friendly operation should be ensured by proper automation ix.Adequate Safety Features should be incorporated to protect the premises and operators against mishaps and accidents  Primary Chamber  i.Auto ON/OFF Burner ii.Auto Temperature Control iii.Excess Air Blower Fan iv.Chamber constructed of two layer refractory linging v.Compressing: Thermal insulator linging and refractory masonry linging sufficient enough to maintain normal temperature at outside  Secondary Chamber  Primary Chamber i.Auto ON/OFF Burner ii.Auto Temperature Control  iii.Excess Air Blower Fan iv.The Chamber constructed of two layer refractory linging, comprising  v.Thermal insulator linging and refractory masonry linging sufficient enough to maintain normal temperature at outside  Control Panel  Standard PLC Control Panel  Note: All instruments/controller must be of high quality, preferably European/Japanese Origin Chimnery/Stack Made of MS Sheet, Sufficiently insulated and Lined with Refractory bricks (where required) to maintain normal temperature at outer surface  Painted with High Quality …

Continue ReadingIndustrial Type Wastage Incinerator Industrial Type Incinerator General Specification i.System Capacity: 100KG/h

Burn Rate * 60 Kg / hr Ingredients to be burned

Burn Rate * 60 Kg / hr Ingredients to be burned Cotton, Rubber, PVC Sheets, PE Gloves, Oil, Plastic Bottles, Paper etc. Chambers * Dual Chamber. 1: Primary Controlled Air 2: Secondary Excess Air Temperature Monitoring Required Temperature Control to Primary & Secondary Chambers Required System Status & Alarms Required for all necessary parameters. Fittings & Accessories Complete Package is required ( Including Nozzles & Flanges etc.) Installation Requirements. As low as possible . Almost Plug & Play type. Dimensional Sketch, Operation & Installation Manuals. Required Off – Gas System Required Heat Insulation Required for indoor installation Delivery Karachi Sea Port – Pakistan The details of Components of incinerator is as follows: Component Name     Features              Range.…

Continue ReadingBurn Rate * 60 Kg / hr Ingredients to be burned

SPECIFICATIONS OF THE JKUAT INCINERATOR It should  be  a three chambered incinerator 

SPECIFICATIONS OF THE JKUAT INCINERATOR It should  be  a three chambered incinerator  The load capacity of 250 kg The housing for the incinerator should be able to withstand the temperatures and other operational requirements. The chimney should have a strong refractory lining of special type of cement to withstand temperatures more than 1200oc. It should have a strong base for the machine to keep it stable, firm and secure during its operational lifespan. The primary (combustion) and the secondary (scorching) chambers to be fitted with burners for effective combustion. In the third chamber, scrubbers and precipitators will need to be installed as pollution control equipment before emission of gases into the atmosphere. A system for continuous emission Monitoring and Environmental Monitoring. A mechanism with which to treat the waste water before discharge into the sewerage system. Temperature control and monitoring devices (probe thermometer) should be availed to ensure that the right temperatures are attained in the chambers during operation. Motor (fans) sufficient to induce enough air into the combustion chambers and direct the gases towards the flue 9 chimney). High power electricity and emergency generator connection for automated ignition purposes. The chimney should be tall enough and be at least one meter above the tallest building in the vicinity. The fuel tank (industrial diesel) to be constructed next to but out side the incinerator housing for security purposes and to prevent fire hazards. Capacity of 250. Other Requirements Training of all the personnel involved in health care waste (HCW) management. The Automatic Feeding system of the Incinerator Automatic waste loading mechanism with conveyor belts. These will lead the waste into the first primary chamber. An Automatic bottom ashes discharge system.

Continue ReadingSPECIFICATIONS OF THE JKUAT INCINERATOR It should  be  a three chambered incinerator 

محرقة طبية

معلومات أساسية. نموذج رقم: الصانع من محرقة النفايات الخطرة الصين مصادر السحب: معالجة النفايات الصلبة طرق المعالجة: الاحتراق أسواق التصدير: عالمية وصف المنتج تحليلات السوق الدولية لمحرقة النفايات يعطيك. 10…

Continue Readingمحرقة طبية