WASTE INCINERATOR TECHNICAL QUESTIONNAIRE

Burning capacity (kg/hour)No. of chamber(s)Wet scrubber (Yes/No)Chimney (Yes/No)Fuel (Gas/Diesel/Both)Loading (Manual/Auto)Primary chamber temp.Secondary chamber temp.Third chamber temp.Warmup timeChamber plate thicknessChamber plate materialChimney plate thicknessChimney plate materialChimney lengthChimney diameterGas consumptionDiesel consumptionGas requirement (volume/pressure)Diesel tank (Capacity)Ambient requirement (Temp./Ventilation)Dimension of eqpt. (WxLxH)Reqd. room dimensions (WxLxH)Flue emission temperatureO2/CO/CO2 and other gases in flue emission"Water requirement (Yes/No)If yes, specify details""Drain required (Yes/No)If yes, please specify"Insulation materialInsulation thicknessMax. continuous operating time per day (Hr)Safety standards compliance of flue gas emissions (air + water) Yes/No, Pls specifySpecify wet scrubber drain treatmentAny material restriction for incineration like metal, glass, etc.Refractory materialRefractory thicknessPower supply (Volt/Ph/Hz)Electrical load Warranty periodFactory trained engineers available (Yes/No)"Same model installed at other sites (Yes/No) If yes, please specify clients' name"Spare parts' lead timeLoading chamber volumeWeightLocal display of process parameters via PLC  or controller (Yes/No)Specify safeties in machineSpecify ash removal systemHearth technology availableShare emission report of installed and running incineratorShare wet scrubber drain water report if availableIs there any recommendation of scrubber drain  by regulatory body or can it be drained directly to city sewerage?

Continue ReadingWASTE INCINERATOR TECHNICAL QUESTIONNAIRE