| |
|||||
| waste incinerator | |||||
| 新闻 | |||||
|
'It is a massively flawed scheme': Campaign to stop £300 million waste incinerator in Wisbech that …
A £300 million waste incinerator that could be built in Wisbech would have a chimney higher than Ely Cathedral and be just 200 metres from a school.
|
|||||
|
Why an incinerator developer sought stricter emission limits
A demand to minimise visual impact has indirectly led to the Environment Agency agreeing that the strictest emissions limits ever should apply to …
|
|||||
|
Pow says EfW to be cut back but that 'it has a role'
Speaking in a parliamentary debate on incineration, Pow (pictured) said: … seek to minimise the amount of waste that goes to incineration or landfill, …
|
|||||
|
Incinerator plans are 'misleading'
SWIPE (Stop Waste Incineration, Protect our Environment), concerned residents and amenity groups have all pointed out that the failure to mention the …
|
|||||
|
Incinerator use would not make worsen air quality
A heat and energy recovery use and new external flue at an existing waste recycling complex at an industrial estate in the West Yorkshire green belt …
|
|||||
| 查看更多结果 | 修改此快讯 | |||||
| 您收到此电子邮件是因为您订阅了Google快讯。 |
以RSS Feed的形式接收此快讯 |
|
发送反馈
|


